Guide
How to price a paint job
There is no correct price per square foot that works everywhere. There is a method, and it gives you a price you can defend because every part of it comes from your own numbers.
Updated · 3 min read
1. Measure
Wall area = perimeter × ceiling height, minus openings. A 12 × 14 ft room with 8 ft ceilings has a perimeter of 52 ft, so 416 sq ft of wall. Take off a door (about 20 sq ft) and two windows (about 15 sq ft each) and you have roughly 366 sq ft. The ceiling is 12 × 14 = 168 sq ft. Count doors and measure trim in linear feet.
2. Paint
Gallons = area × coats ÷ coverage. Coverage is printed on the can; many interior wall paints list about 350 to 400 sq ft per gallon, less on rough or unprimed surfaces. Two coats on 366 sq ft is 732 sq ft, a little over two gallons at 350, so you buy three or two plus a quart. Add primer where you are covering patches, stains or a strong color.
3. Hours
This is where estimates go wrong, and where only your own records help. Break the job down:
- setup and protection;
- prep: filling, sanding, caulking, spot-priming;
- cutting in and rolling, per coat;
- trim and doors;
- cleanup and putting the room back.
If you have not tracked your times, start on the next three jobs: write down hours per room per task. After a few jobs you will have your own production rates, which beat any published average because they include how you work.
Things that add hours and should add money: high ceilings and stairwells, heavy furniture, dark-to-light color changes, glossy surfaces that need deglossing, lots of cut-in around built-ins, occupied homes.
4. Your hourly rate
For a solo painter the rate is not what a painter earns per hour as an employee. It has to cover the hours you cannot bill: estimates, driving, buying paint, bookkeeping. One way to get there:
Be honest about billable hours. If you work 45 hours a week and 28 of them are on a wall, the number is 28.
5. Overhead and profit
If your hourly rate already includes your business costs, as in the formula above, add profit on top. If you price labor at wages, add overhead first. Profit is what lets the business survive a slow month, a callback or a customer who does not pay.
Markup and margin are different things. Adding 50% to your cost gives a margin of 33%, not 50%, because margin is measured against the selling price.
6. Check it
Compare the total with jobs like it that you have done. If it is far off, find out why before you send it. Then put it on paper with the scope spelled out: painting estimate template.
What about price per square foot?
Per-square-foot and per-room prices are useful once they are built from your own finished jobs. Take what you charged, divide by the area, and you have a number that reflects your speed, your market and your standards. A number from a website reflects none of those.
Homes built before 1978 may contain lead-based paint. Paid work that disturbs paint in those homes is covered by the EPA’s RRP rule. Find out what it requires of you before pricing prep work that involves sanding or scraping.
Common questions
- How do I estimate how much paint I need?
- Multiply the area by the number of coats and divide by the coverage figure on the can. Round up, and allow more for rough, porous or unprimed surfaces.
- Should I charge by the hour or by the job for painting?
- Most customers want a fixed price for a defined scope. Work out that price from your hours and rate, and keep an hourly rate for extras that come up after the job starts.
General information for small service businesses, not legal, tax or accounting advice. Contractor licensing, deposit limits, sales tax and contract rules differ by state and sometimes by city; check the rules where you work. Quote Pinger is in development.