Skip to content
Quote Pinger Join the waitlist

Guide

What to say when a customer says “that’s too expensive”

“Too expensive” is not one objection. It can mean more than I have, more than the other quote, or more than I expected. Each needs a different answer, and none of them is an immediate discount.

Updated · 2 min read

First, ask

Before you defend the price, find out which kind of “too expensive” it is:

“Thanks for telling me. Is it more than you’d budgeted, or are you comparing it with another price?”

Then wait for the answer. Most contractors fill the silence with a discount.

If it is over their budget

Change the scope, not the rate. Offer versions:

  • do the main rooms now and the rest later;
  • a simpler finish or product;
  • the customer does part of it, such as moving furniture, demolition or haul-away;
  • split the job into stages with a price for each.

The customer gets a number they can afford and you keep your rate. A lower price for less work is a different job. A lower price for the same work is a pay cut.

If they have a lower quote

Ask to compare the scopes line by line. Do not criticize the other contractor. Very often the cheaper quote has one coat where yours has two, no prep, no haul-away or no insurance. Point at the differences and let the customer decide:

“Happy to look at it with you. Mine includes [prep / two coats / removal of the old material]. Is that in the other one? If you’d rather not have it, I can take it out and re-price.”

If the scopes really are the same and they are cheaper, they may simply have lower costs or want the work more. You do not have to match it.

If it was just more than they expected

This is sticker shock, and it comes from not knowing what goes into the job. Walk them through the estimate: materials, the hours, what the prep involves. A detailed estimate does most of this for you, which is one reason to write the scope out.

When a discount is fine

When you get something back for it:

  • flexible dates that let you fill a gap in your schedule;
  • a larger scope or a second job booked at the same time;
  • payment in full up front, where your state’s deposit rules allow it;
  • a repeat customer whose jobs run smoothly.

Say what the trade is: “If you can be flexible on dates, I can do it for X.” A discount given for nothing teaches the customer that your first price was padded.

Know your floor

Work out, before the conversation, the lowest price at which the job is still worth doing: your costs, your time and something for the business. Below that, the right answer is a polite no:

“I understand. I can’t do it properly for less than that, and I’d rather not cut corners on your house. If things change, I’d be glad to do the work.”

Some of those customers come back, often after the cheaper option went badly.

If you hear it on most quotes

An occasional “too expensive” is healthy; if nobody ever says it, you are probably too cheap. If nearly everyone says it, look at who you are quoting. You may be reaching customers who are shopping for the lowest price, in which case the fix is where your leads come from, not your rate.

General information for small service businesses, not legal, tax or accounting advice. Contractor licensing, deposit limits, sales tax and contract rules differ by state and sometimes by city; check the rules where you work. Quote Pinger is in development.

Send the quote before you leave the driveway

Quote Pinger builds the quote on your phone, sends it with an Accept and pay deposit button, and follows up for you on day 2 and day 5. $25/month, one plan.

Join the waitlist